Tropical Beach With Palms In Kood Island Thailand - ID # 22403975

$79.95
As low as: $59.95
Download PDF: Acoustic Panel Certified Fire Rating Test Results

Availability: In stock

SKU: 22403975

Product Customization

loader
Loading...
* LEAD TIME DISCLAIMER:
By purchasing this item, you understand that what we refer to as "Lead-Time" is an estimate, this estimate is based on the approximate time it takes to process your order from payment to shipment, assuming no delays in processing your order's graphics are encountered.

QUANTITY AND SPANNING OPTIONS MAY AFFECT LEAD TIME:
Larger orders, and large multi-panel spans may require more time to process and complete. Feel free to give usd a call at 888-827-1266, or send an email to [email protected] for more information.
  • Single Panel Per Image
    Single Panel Per Image
  • SPAN or STACK one image across SELECTED SIZE AND QTY OF PANELS
    SPAN or STACK one image across SELECTED SIZE AND QTY OF PANELS
  • Landscape (Horizontal)
    Landscape (Horizontal)
  • Portrait (Vertical)
    Portrait (Vertical)
  • Designer's Choice (Recommended)
    Designer's Choice (Recommended)
  • Beveled Edges : Hardware Included
    Beveled Edges : Hardware Included + $5.00
  • Square Edges :  Hardware Included
    Square Edges : Hardware Included
  • Owens Corning 703 (standard with AcousticART)
    Owens Corning 703 (standard with AcousticART)
  • EcoCore
    EcoCore + $10.00

Upload your high definition images here

(A new window will open, be sure to allow if you have a pop-up blocker)
Drag and drop your file in the new window and be sure to enter the same email address you areusing to place the order. Or click here for our Stock Art Gallery with over 1600 images tochoose from
WHAT KIND OF FILE DO I NEED?
Generally, we ask that you send us as high resolution an image as possible.We will verify the image and contact you if any issues arise. We accept the following bitmapformats: .jpg, .png, .psd, .tiff and uncompressed .raw files. We also accept the followingvector formats: .ai, .svg, .dxf, .dwg and vector .eps files. For Bitmap Graphics, our maximumprint resolution is: 150 pixels per inch (DPI). To determine the best resolution in pixels foryour desired panel size, multiply the number of inches by 150, and the result will be yourrecommended number of pixels for that dimension.
NOTE ON ENLARGED IMAGESD
Please provide the image in it's native size and resolution, do not attemptto scale the image up yourself.
Product Details

INCLUDES MOUNTING HARDWARE



Acoustimac Acoustic Product Technical Data:


 

CLICK A TAB ABOVE TO VIEW TECHNICAL DATA
ON OUR AVAILALE CORE MATERIALS


NRC Values not provided by the manufacturer
in 4" and 6" thicknesses on some core materials.

Owens Corning Mineral Wool (MW) - Select Thickness:

NRC125Hz200Hz500Hz1000Hz2000Hz4000Hz0.00.51.01.52.0
1/3 Octave Band Center Frequencies In Hz.
HZ 125 200 500 1000 2000 4000
NRC 0.18 0.65 0.98 1.05 1.01 1.02

Owens Corning 703 - Select Thickness:

NRC125Hz250Hz500Hz1000Hz2000Hz4000Hz0.00.51.01.52.0
1/3 Octave Band Center Frequencies In Hz.
HZ 125 250 500 1000 2000 4000
NRC 0.11 0.28 0.68 0.90 0.93 0.96

ECO-CORE - Select Thickness:

NRC125Hz200Hz500Hz1000Hz2000Hz4000Hz0.00.51.01.52.0
1/3 Octave Band Center Frequencies In Hz.
HZ 125 200 500 1000 2000 4000
NRC 0.09 0.21 0.84 1.05 1.05 1.05
More Information
SKU 22403975
GTIN 734038898994

FREQUENTLY ASKED QUESTIONS

  • Q: Do you have a product guide for your acoustic panels, or a diagram of how your panels are built?
    1. A:You can download a full product guide here:
      PRODUCT-DATA-2020.pdf
      This guide contains a full breakdown of how our panels are constructed as well as their fabric color options, core material ratings, fire and acoustical test results, all in 1 printer friendly PDF.

  • Q: Where can I get Testing data for your products Acoustical Performance? (ASTM-C423)
  • Q: What are acoustic panels used for?
    1. A: Sound panels are used to remove reverb and echo in any room. They provide excellent sound absorption at all high and mid frequencies. Sound absorption panels placed on the first reflection points in a listening room will greatly enhance the overall sound. Because in doing so you stop the sound waves from bouncing back and fourth, which in turn yields better stereo imaging and a greater depth of sound stage.

  • Q: What’s the difference between an acoustic panel and a bass trap?
    1. A: Bass traps are thicker and denser versions of our acoustic panels which are designed to absorb bass frequencies down to 40 Hz . Acoustic panels are designed mostly to absorb high and mid frequencies (human voices, treble...) with some bass absorption (from 250 Hz to 4000 Hz). Acoustimacs bass traps absorb high frequencies just as well as our standard panels, except they have the added advantage of being able to absorb much more of the lower frequencies. Bass absorption panels such our Corner trap work best if placed in room corner. They help eliminate standing waves, dips and spikes that are notoriously prevalent in smaller rooms. So for example, if you notice that you have too much bass in one spot of the room, and very little in the sweet spot, you needs bass traps to calibrate the room lows and to give you as flat a low frequency as possible. Which results in tighter punchier bass that does not overwhelm the rest of the instruments and sounds equally good no matter where you sit in the room.

  • Q: Can I use bass traps instead of acoustic panels?
    1. A: You sure can! Our bass traps offer broadband absorption (Highs, mids and lows). In fact Acoustimac’s PRO series room packages consist of all bass traps. Remember bass is the toughest frequency to control, so bass traps are a must. The more you deploy the better off you are, especially in smaller rooms where bass frequencies are a major problem.

  • Q: Are sound panels or bass traps used for soundproofing?
    1.   A: No, they are not designed for that purpose. Please see our Soundproofing FAQ for details. Although they provide excellent sound absorption inside a room, they have no impact on the amount of sound transmitted through walls, windows and crevices. Acoustic panels are mainly used to condition sound in the room and make it more pleasant by reducing echoes, slap, reverb caused by sound waves reflecting on hard surfaces and parallel walls. Visit our Soundproofing FAQ for more detailed information about noise control.

  • Q: How many acoustic panels and/or bass traps do I need to properly treat my space for echoes and reflection?
    1. A: It all depends on the total square footage of hard surfaces in a room. For optimum performance, the recommended minimum coverage is 25 to 30% of all hard surfaces. By providing us with the room’s measurements, we can calculate exactly how many panels you would need for your deployment scenario. Give us a call and we’ll walk you through the process. (See next FAQ Item)  

  • Q: How are your panels and bass traps installed on walls?
    1. A: Acoustimac provides z-clips installation hardware with all of its acoustic panel and bass trap products. You attach two Z-Clips on the upper corners of the panel backing, about an inch or more from the edges using provided wood screws, be sure to orient the screw holes to the top. Then attach the remaining two Z-Clips to the wall with the screw holes oriented to the floor and be sure they are at the same level and are spaced the same as they are on the panel. Then you slide the clips on the panel over the clips on the wall and that’s it.

      Please view installation diagram below for standard acoustic panel or bass traps:Panel wall installation

      Panel wall installation

      Please view installation diagram below for corner bass traps

  • Q: How do you install acoustic panels on ceilings?
    1. A: Z-bar installation :  Requires 4 Z-bars per panel as shown below. You will set up two bars on the ceiling, parallel and with the raised sides facing each other. Then you will install the bars onto the panel back boards, taking into account the spacing you set up between the bars on the ceiling, also parallel to each other but with the raised sides facing away from each. Then you slide the unit's bars into the bars on the ceiling :

      B: Ceiling Suspension with Eye-Hooks :

      The other installation method on most ceilings would be to suspend the panel by using eye hooks and nylon or wire lines.
      See diagram below:Ceiling Panel Installation

      Ceiling Panel Installation

  • Q: How can I install my BASS TRAP or CORNER BASS TRAP to straddle the corner of my wall and ceiling horizontally?
    1. A: For CORNER Bass Traps, you install the clips to the tapered sides of the trap, however you orient the clips on the back as shown below:

      For REGULAR Bass Traps with Corner Mounting Brackets, you will install the 45 degree brackets to the ceiling and wall, then orient the Z-clips on the back as sown below:

  • Q: How are acoustimacs sound panels rated?
    1. A: Panels are rated in NRC (Noise Reduction Coefficient) and our bass traps in Sabins (unit of measure of sound absorption in the inch-pound system). All of bass traps and panels are independently tested by Riverbank Acoustics. The higher the absorption # the better the panel is. This is important because it’s a very effective way to gauge panel performance when compared to other vendors or similar products in different thicknesses from the same vendor. Acoustimac panels and bass traps have some the best absorption coefficient in the industry.  

       

  • Q: What is the difference between the acoustic core materials? (owens corning fiberglass, mineral wool and Eco core recycled insulation)
    1. A: They all provide excellent absorption, but we offer our customers the choice for different reasons. Here are the main varying features to each of our insulation types: -Owens Corning 703 and 705 - Acoustimac offers this insulation as a choice mostly because of popular demand. For decades, Owens Corning rigid fiberglass insulation has been the mainstay of the industry. -Mineral Wool 1260 and 1280 (Rockwool/ Roxul) - This insulation is our primary production insulation because it outperforms Owens Corning 703 in sound absorption and is more eco friendly than OC703. -Acoustimac Eco core Insulation (4Lb) - is the best sound insulation we have to offer in terms of performance. It outperforms them both and is much more durable and does not irritate skin like fiberglass does. Not to mention it’s made of 100% recycled materials and is completely biodegradable.

  • Q: What kind of fabrics and colors does Acoustimac have available?
    1. A: We currently carry over 40 colors in over three different collections. VIEW OUR SELECTION OF COLORS HERE:  

  • Q: Can I get acoustic Fabric samples?
    1. A: Of Course, we offer samples from any of our fabric collections. Visit our sample center or send an email using the contact form to request a sample set.

  • Q: Can I send you fabric to wrap my panels?
    1. A: Sure thing. We would be glad to fabricate sound absorption panels for you, using your own fabric. The cost will be the same as our standard DMD panels. You will be required to send us the fabric before production can begin. Also we advise you to use a breathable fabric for acoustic transparency as a fabric with too tight of a weave will reflect sound which render the panel useless. Also, the fabric needs to be at 6-9" wider than the desired panel size to account for the sides.

  • Q: Do you make custom sizes? (Spoiler: YES WE ABSOLUTELY DO!)
    1. A: Custom Sizes is what we do best! And you'll be hard pressed to find anywhere else who can get them done sooner than us. We can make you panels in any size up to 48"x96". As long as the shapes are rectangles and squares. On ocassion we can make other geometrical shapes but those are determined on a case by case basis. Contact one of our experts to see if we can bring your idea to life.

  • Q: Can I get Beveled edges on my panels instead of squared? (Spoiler: Yep!)
    1. A: Yes, we offer 45 degree beveled edges for a small upcharge.

  • Q: How can I determine how many square feet in acoustical coverage I'll need to treat my space?
    1. Room Coverage Calculator

      To Use Our Room Calculator Click Here

Reviews
Loading Loader
Submit a support Ticket.
Please fill the form below and we will respond as soon as possible.

Let us know how we can help. Please choose from one of the topics on the list, or select 'other' if it's not listed.

Note: Compatible file extensions to upload: jpg, jpeg, gif, png, bmp, pdf